School News

The Sixth Form and Science block extension are taking shape and work has started on the foundations for the new drama/dance changing rooms. The layout and design for the new cooking room has been signed-off, along with a new prep room for science. A new canopy covering the ‘kiosk’ seating area should be installed over the summer, enabling students to enjoy their break time outside, whatever the weather!